BEGIN:VCALENDAR
VERSION:2.0
X-WR-CALNAME:Urban Design Projects
PRODID:-//Sitemason, Inc//Sitemason Calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:US-Central
LAST-MODIFIED:19870101T000000Z
BEGIN:STANDARD
DTSTART:16011104T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:16010311T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:http://www.sitemason.com/element/c4w7ho5/id/9515
SUMMARY:The Green Hills Streetscaping / Signage Study
DESCRIPTION:At the request of the West Area Business Council (WABC)\, a volunteer organization formed by members of the Nashville Area Chamber of Commerce\, the Nashville Civic Design Center conducted a short study of the opportunities afforded in adopting portions of the area’s Urban Design Overlay\, especially those related to awnings and signage. An Urban Design Overlay (UDO) [http\://www.nashville.gov/mpc/WhatIsUDO.htm]\, is a zoning tool\, developed by the Metro Planning Commission.\nThe series of drawings below illustrate what Hillsboro Pike could look like with the larger\, billboard scale signs removed\, replaced with smaller signs\, and with new sidewalks and streetscaping.\nExisting Conditions\nLarge Billboards Removed - signage located on buildings\nPowerlines Removed - buried underground or relocated to rear of buildings\nNew Lighting\, Sidewalks and Streetscaping\nOTHER RESOURCES\:\nGreen Hills Urban Village Plan [http\://www.sitemason.com/files/clgpWg/GreenHillsUrbanVillagePlan.pdf]\n- Metropolitan Planning Commission (6.5 mb pdf)\n
URL;VALUE=URI:
CATEGORIES:urban-design-projects
CLASS:PUBLIC
SEQUENCE:7
DTSTAMP:20120517T194446
CREATED;TZID=US-Central:20090408T153020
LAST-MODIFIED;TZID=US-Central:20101210T090925
DTSTART;TZID=US-Central:20080815T152300
END:VEVENT
END:VCALENDAR

