Belmont-Hillsboro Neighborhood Traffic Calming

In spring of 2017 Nashville’s first pop-up traffic circle was constructed. Data was collected by Metro Public Works on Elmwood (the cut through street). Speeding traffic on the street was reduced by 75% over the two week pilot period. The permanent version of the installation was implemented by Metro in spring of 2019, two years after the first TURBO project. Music: https://www.bensound.com